Laserfiche WebLink
MMRR Quarry, M-2004-067 <br />Response to June 30 Adequacy Review (as amended) <br />August 19, 2005 <br />Page 7 <br />9. Of the additiona1400,000 cubic yards of material generated as described above, please define <br />the maximum volume to be temporarily stored on site during construction of the primary access <br />road and where the material will be located. <br />As noted in response to the comment above, the referenced temporary storage <br />will no longer be necessary based on the elimination of the 400,000 cubic yard <br />rock cut to build the access drive. <br />10. Please provide revised Exhibits F, C-28, & C-2C to include a drainage channel receiving <br />upland diversion flows near the northwest corner of the Processing Plant 8 Product Stockpile <br />area (PPPS) which routes the runoff along the southern edge of the PPPS area and connects <br />with the runoff diversion channel that flows along the northern edge of the PPPS area. If the <br />applicant has determined that a diversion channel in this location is not necessary, please provide <br />a rationale for deleting the diversion channel in this location. <br />Please see the enclosed revised drawings and the attached report submitted by <br />Ramsay M. McDermid. <br />11. Please provide a representative cross section and percent slope for each reach of diversion <br />channel to be installed. The cross sections should include the following features: channel <br />configuration, side slopes, bottom width, & depth. <br />Please see the attached report submitted by Ramsay M. McDermid. <br />12. Please provide supporting watershed information and/or hydraulic computations to verify the <br />adequate sizing of sediment pond structures, culverts, or drainage channels treating or conveying <br />runoff waters from the contributing watershed. <br />Please see the attached report submitted by Ramsay M. McDermid. <br />13. Please provide a representative plan view and cross sectional design for the porous rock <br />check dams to be installed at 50' intervals in the roadside ditches of the main access road. The <br />applicant will also need to provide a representative profile of the main access road showing the <br />slope of the access road and a series of at least two (2) rock check dams. <br />Please see the attached report submitted by Ramsay M. McDermid. <br />14. A statement on page 13 of the Response to Adequacy Review, ';4 permanent sedimentation <br />basin, referenced as Sediment Pond C in the initial drawings and the DMG adequacy review <br />letter, has been removed from the reclamation plan" is inconsistent with the Revised Exhibit C-2C <br />which shows the permanent Sediment Pond C. Please address. <br />Please see the attached report submitted by Ramsay M. McDermid. <br />15. Revised Exhibit C-28 shows two sedimentation ponds labeled as sedimentation pond 8. One <br />of the sedimentation ponds labeled "B" is labeled with a capacity of 220, 000 cubic feet, and the <br />other pond labeled "B" does not show a design capacity. Please address. <br />Please see the attached report submitted by Ramsay M. McDermid <br />