Laserfiche WebLink
Mr. Gilbert F. Rindahl - 5 - June 17, 1985 <br /> Shorline (2.5 acres) - <br /> assume all slopes mined to 3H:lV or 2H:1V depending upon depth. <br /> Topsoil - 12" depth <br /> Ave haul = 3,000 from <br /> NW topsoil pile <br /> 83% efficienty <br /> 613E scraper <br /> ($1 .19/yd3) (4033.33yd3) _ $4,799.66 <br /> Seeding - (157.50/Ac)(2.5/Ac) = 393.75 <br /> Seedbed prep./drill - ($174.92/Ac) (2.5/Ac)=437.30 <br /> Fertilizer - ($50.00/Ac)(2.5/Ac) = 125.00 <br /> Mulch - ($150.00/Ac) (2.5/Ac) = 375.00 <br /> Subtotal = $6,130.71 <br /> Total recomended bond amount = $10,670.94. <br /> Please forward the publication and notification materials as soon as they <br /> become available. Thank you for your continued cooperation. <br /> Sincerely <br /> . c <br /> id Berry <br /> Reclamation Specialist <br /> DB/ygt <br /> cc: Varra Companies, Inc. <br /> Doc. No. 1324 <br />