Laserfiche WebLink
Y. <br />• • <br />Mr. Neil Sprague - 2 - Jaluary 14, 1986 <br />I <br />8. What will be the general slope of the reclaimed areas?~ <br />9. What will be done to make the banks "secure" as stated~in the <br />reclamation plan. <br />10. An expected reclamation cross-section would be helpful} <br />11. The applicant should commit to analyzing the salvaged eclamation <br />material to determine what, if any, fertilizer is nece~sary to help <br />revegetation. <br />12. Unless immediate plans for housing construction are an icipated in <br />this area, the operator must commit to reclaiming to m untain grass <br />land. I <br />13. Will all haul/access roads be reclaimed? Those propos@d as <br />permanent must be clearly delineated. 1l <br />14. The reclamation plan states that SCS recommendations w~11 be <br />followed. Reclamation costs include seedlings not rec mmended by <br />SCS. How will these seedlings be planted? <br />15. Reclamation costs are based upon the Division completing <br />reclamation because of inability on the operator's par These <br />costs must include equipment rental by the Division. owever, <br />maximum bond fora 110 permit can not exceed 55,000.00 I have <br />attached a recalculation of these costs. <br />16. The tax receipts submitted as Exhibit G do not include a legal <br />description that matches that of the description in Exhibit A. <br />Please clarify. <br />Loveland Bluff-Trupp Quarry <br />1. The application should contain a commitment to salvagi g all <br />available topsoil and fines for later use in reclamati n. The map <br />should show where the salvaged material will be stockpiled. The <br />operator must commit to seeding this material to preve t erosion if <br />stockpiles will remain in place for more than one seas n. <br />2. The map must identify any adjacent landowners. ~, <br />3. Sections A and B as identified in the mine plan should be labeled <br />on the map. <br />4. How deep will these quarries be mined? <br />5. Will any vertical highwalls be left upon completion of mining? <br />6. what will be the general slope of the reclaimed areas? <br />7. What will be done to make the banks "secure" as stated in the <br />permit application? <br />