Laserfiche WebLink
<br />STRUCTURAL DEMOLITION NORK cont'd <br />sheet 3 of 4 <br /> MEANS BASEI TOTAL <br />STRUCTURE / FACILITY / EOUI PMENT DESCRIPTION <br />______________________________________________ ~ DIMENSIONS <br />===== ~ COMPOSITION I QUANTITY I UNIT I UNIT COST ~ COST (E) <br /> <br />Hoist mechanism, w/ cable I <br />_________'_'_'___' <br />~ meth tot 10 cy _~________===============I========I=====_=====I= <br />~ steel ~ 270 ~ cf ~ E0.17 ~ ====_______ <br />E49 <br />remove from mount, onsite burial in pit <br />loader or dozer push to pit, 50 ft <br />Concrete perimeter footer, Change room ~ LF 140, 6x24 in, rod ~ conc, steel ~ 140 ~ LF ~ E9.15 ~ E7, 373 <br />tot 140 LF, 6in x 24in, rod reinf <br />break and bury onsi to ~ ~ ~ ~ ~ <br />Concrete Perim ftr, hoist bldg <br />tot 112 LF, 6in x 24in, rod reinf <br />break and bury onsite <br />Concrete ftrs, headframe derrick <br />qty 4, size 1x1x5 ft ea (esti m) <br />break and bury onsite <br />Haste oil stored at site, estimate 2 drums, <br />of 55 gal ea, remove and dispose at proper <br />facility, 50 mi trip <br /> <br />LF 112, 6x24in, rad ~ conc, steel <br />size 1x1x5 ft ea, rod ~ conc, steel <br />drum vol tot 110 gal ~ waste oil <br />distance 50 mi est <br />112 ~ LF ( E9.15 <br />4 ~ LF E9.15 <br />2 ~ drum ~ E250.00 <br />50 ~ mi ~ E4.35 <br />E1, 099 <br />E39 <br />E536 <br />E233 <br />__________________________________________________________________________________________________________________________________ <br />TASK SUBTOTAL sheet 3 E3,329 <br />