Laserfiche WebLink
<br />STRUCTURAL DEMOLITION YORK cont'd <br />w <br />sheet 2 of 4 <br /> MEANS BASE TOTAL <br />STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION I <br />____________________ ______ <br />______________ DIMENSIONS <br />=====_______ I <br />__===== COMPOSITION ~ QUANTITY I UNIT ~ UNIT COST I COST (E) <br />_____ <br />I <br />Head frame, steel, conc ftrs ~ _____ <br />frame 1000 LF a I <br />4x6 in ~ =====__ <br />steel _===== I=:========I <br />~ 1,000 ~ ========I= <br />LF ~ ====:=====I= <br />E3.38 ~ ====_______ <br />E3, 623 <br />dismantle or cut for onsi to disposal ~ skip/mist meth 2 5x5x5 ~ steel ~ 625 ~ cf ~ E0.17 ~ E114 <br />derrick size 80 ft ht x avg 15 ft x avg 15 ft <br />skip size 20x5x5, mist meth size 8x5x5 <br />Compressor, steel, anchored to conc slab ~ comer Sx3x10 ~ steel ~ 150 ~ cf ~ E0.17 ~ E27 <br />size Sx3x10, elec power ~ loader carry 50 ft <br />remove from mount, carry to pit for buri aL <br />Concrete slab, under orebins, assume rei of ~ slab 30x20, bin reinf ~ conc, steel ~ 600 ~ sf ~ E2.94 ~ E1,891 <br />size 30x20, b in thick <br />break and bury onsite <br />Concrete ftrs, under orebins (4 tot) ftrs 1x1x3, rod reinf ~ conc, steel ~ 4 ~ LF ~ E9.15 ~ S39 <br />size ea 1x1x3, remove and bury onsite <br />Concrete slab, under headf rame, assume reinf ~ slab 30x30, bin reinf ~ conc, steel ~ 900 ~ sf ~ E2.94 ~ E2, 837 <br />size 30x30, b in thick <br />break and bury onsite <br />Concrete slab, under open sided shack ~ slab 10x16, bin rei of ~ conc, steel ~ 160 ~ sf ~ E2.94 ~ E504 <br />assume reinf, size 10x16, b in thick <br />break and bury onsite <br />Concrete slab, under change rooMshop ~ slab 37x22, bin rei of ~ conc, steel ~ 814 ~ sf I E2.94 ~ E2,565 <br />assume reinf, size 37x22, 6 in thick <br />plus slabs (2) under compressor, assume reinf ~ heavy 6x12, 12in rei of ~ conc, steel 144 I sf ~ E5.88 ~ E908 <br />size of each 6x12, 12 in thick (2 slabs) <br />break and bury onsite <br />Concrete slabs, hoist bldg, assume reinf ~ slab 24x32, 12in reinf ~ conc, steel ~ 768 ~ sf ~ E5.88 ~ E4,841 <br />size 24x32, 12 in thick <br />plus slab under hoist meth, 10x10, 24in thick ~ heavy 10x10, 24 rei of ~ conc, steel ~ 200 ~ sf ~ E8.88 ~ 51,261 <br />break and bury onsite <br />Concrete collar, vent shaft #1, assume rei of ~ slab 10x15, Bin rei of ~ conc, steel ~ 150 ~ sf ~ E4.00 ~ E643 <br />size 18ft dia wt Eft dia hole, 8 in thick <br />break and bury in shaft area <br />Concrete collar, vent shaft #2, assume rei of ~ slab 10x15, Sin rei of ~ conc, steel ~ 150 ~ sf ~ 54.00 ~ E643 <br />size 15ft dia w/ bft hole, assure 8 in thick <br />break and bury in shaft area <br />Debris at 2 vent shafts, onsite burial at ea ~ debris 5 cy ~ metal, wood ~ 135 ~ cf ~ E0.17 ~ E25 <br />shaft site, no haul to pit, tot vol 5 cy <br />Debris in bldgs, onsite burial in pit ~ debris 15 cy ~ metal, wood ~ 405 ~ cf ~ E0.17 ~ f74 <br />voL est 15 cy, push into pit, no haul <br /> TASK SUBTOTAL - sheet 2 E19,995 <br />