Laserfiche WebLink
<br /> <br />Prablema - <br />1) The excavated material may not be suitable for topsoil. <br />2) Costa of digging the pit and moving all of the refuse piles may <br />be prohibitive. <br />Estimated Costa - <br />Dig pit <br />Push refuse into pit <br />Place excavate on refuse pit (6") <br />Cover crop and seeding <br />Bank eloping <br />Topsoiling disturbed area (3") <br />5000 cy @ $.60 3,000 <br />5000 cy @ $.50 = 2,500 <br />1000 cy @ $.50 = 500 <br />11.5 Ac @ $125 1,43R <br />1,0 Ac @ $300 = 300 <br />1000 cy @ $2.00 2,000 <br /> $9,738 <br />Proposal 2 - <br />Shape and compact the refuse piles, Apply topsoil to all of the <br />refuse areas, <br />Problems - <br />1M The area will still be rough and it may be difficult to enticely <br />cover the trash. Some of the trash may have to be hauled away. <br />2) Topsoil may be difficult and very expensive to get since it is <br />not available onaite, <br />Estimated Costa - <br />Shaping refuse piles 3,6 Ac @ $300 1,080 <br />Topsoiling refuse piles (6")* 3000 cy @ 52,00 = 6,000 <br />Flatten elopes by filling* 2252 cy @ $2.00 4,504 <br />Bank sloping 1,0 Ac @ $300 300 <br />Cover crop and seed 11.5 Ac @ $125 1,438 <br />$13,322 <br />* The cost of topsoil could vary greatly either up or down from the <br />figures used depending upon its location. A variation of 100 <br />percent is possible. <br />