Laserfiche WebLink
r • • III III IIIIIIIIII 111 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1313 Sherman SL, Room 215 ry` <br />Denver, Colorado RO?03 T <br />r <br />Phone: (1011 RGG-1567 Ill <br />FA% (3031 Bl? R106 <br /> DEPARTMEN'T' OF <br /> NATURAL <br /> RESOURCE <br /> Roy Ramer <br /> Governor <br />December 5, 1996 <br /> lames 5. LochheaA <br /> Executive Dveaor <br />The Denver Brick Company Michael B. Long <br />Attn: Mr. Wayne Spence Drv~s~on Duector <br />Box 1600 (401 Santa Fe Road) <br />Castle Rock, CO 80104-1600 <br />RE: Stevens Clay Lease; File No. M-96-064; Adequacy Review for 112 <br />Permit Application <br />Dear Mr. Spence: <br />The Division has completed its initial adequacy review for the <br />Stevens Clay Lease 112 Permit Application. The application is well <br />organized and addresses the majority of the operation and <br />reclamation plan concerns. There are a few items that will require <br />clarification and/or additional submittals prior to DMG issuing a <br />decision for this site. The review follows the application format <br />with any requests for additional information under the appropriate <br />exhibit heading. <br />Exhibit A- Legal Description <br />NO COMMENT <br />Exhibit B-Index Map <br />The exact access to the pit off of Crowfoot Valley Road must be <br />clearly identified and illustrated. Exhibit B does not clearly <br />show where the access road described in Exhibit D is located. This <br />should be amended to include the above items. <br />Exhibit C- Pre-Mining and Mininq Plan Maps <br />The typical mining layout illustration indicates that the topsoil <br />and overburden stockpiles will be stored on the west side of each <br />phase. There is a small surface water run-off feature (gully) that <br />cuts through the southwest corner of phase I. Care should be taken <br />so that the topsoil and overburden stockpiles are not placed within <br />this drainage course, or the drainage should be diverted around <br />phase I until reclamation is completed. <br />