Laserfiche WebLink
i i III IIIIIIIIIIIII III <br /> 999 <br /> EipvirojoMeipt, Ipc. <br /> LARRY E. O'BRIAN 9989 WEST 8OTH AVENUE <br /> PRESIDENT ARVADA COLORADO 80004 <br /> 3b3-423-7297 <br /> August 22 ,1984 RECEIVED <br /> Ms. Carol Russell AUG 2 1984 <br /> Colorado Mined Land Reclamation Division <br /> 1313 Sherman Street Suite 423 <br /> Denver, Colorado 80203 MINED LAND RECLAMATION DIVISION <br /> Colo. Dept. of Natural Resources <br /> Dear Ms. Russell : <br /> Re: Addendum to MLR File NO. M-84-099 <br /> J-Bar-B, Inc, Bailey Pit <br /> St. Vrain Creek is currently continueing, the normal process, <br /> of eroding out the bank on the east side of the horse shoe bend <br /> in the creek where it crosses the west side of the affected <br /> lands in Stage 1 . It is our understanding that the MLRB wants <br /> the creek erosion minimized. <br /> To minimize erosion the operator will place rip rap or <br /> rip rap like material along the slope of the east bank of the <br /> creek, where erosion is occurring on the horse shoe bend. No <br /> material will be placed in the creek. This operation will be <br /> carried out when the operator has equipment on site that is <br /> capable of doing the work. Such equipment will be on site when <br /> mining starts. <br /> Sincerely, *M4-1 <br /> Lar7E. O' Brian <br />