Laserfiche WebLink
CIRCES Cost Estimatinsl Software <br />PROJECT IDE NTIFICATION <br />Task # : 30C <br />Date : 10/11/2007 <br />User: JHB <br />State :Colorado PermiUjob# :X2007-230.00 <br />County :Rio Blanco Abbreviation :none <br />Site :Bme Exploration Filename :X-00.30C <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or otherjob action :X2007-230-00: expl. holes 310119-7 & 310210-15 <br />Task description :Replace topsoil on regraded drill pads <br />Basic machine :Cat D8R Series ll - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachmentno.2 :NA <br />Horsepower: 310 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.32 NA <br />Operating cosUhour : $77.13 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosVhour : $32.78 NA <br />Total unit cosUhour : $160.22 Total fleet cosUhour : $160.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 387 LCY factor : NA volume : 387 LCY <br />Source of estimated volume : appl. 0.24 ac X 12"topsoil <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Co rrection Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.50 % (I <br />Average site altitude : 5, 750 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Orv Docked <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.213 /LCY <br />Operator skill : 0.75 (ao <br />Material consistency : 1.20 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (ao <br />Job efficiency : 0.83 (1 shit <br />Spoil pile : 0.80 (fir <br />Push gradient : 1.00 (Cat <br />Altitude <br />Material weight <br />Blade type : 1.00 ~ <br />: 0.90 i <br />: 1.00 (Cat <br />(Cat <br />(S/S <br />Net correction : 0.54 <br /> Adjusted unit production : 752.73 LCY/hr <br />Adjusted fleet production : 752.73 LCY/hr <br />Total job time : 0.51 Hours <br />Total job cost : $82 <br />