My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41057
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:51 PM
Creation date
11/20/2007 10:37:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200723000
IBM Index Class Name
Permit File
Doc Date
10/12/2007
Doc Name
Completeness Letter
From
DRMS
To
Blue Mountain Energy Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or otherjob action :regrade 2 exploration pads <br /> Basic machine :Cat D8R Series Il - BSU (200: Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization °l° <br />Cost Breakdown : Ownership cesUhour : $50.32 NA <br /> Operating cosUhour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $160.22 Total fleet cosUhour : $180.22 <br />,:: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 387 CCY factor : 1.125 volume : 435 LCY <br /> <br />Source of estima ted volume :Appl. 0.24 ac. X 1 R. thick <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unad}'usted hourly production : 1,400.0 LCYthr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshi/Uday) <br />Loose stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.50 % (pos) Altitude : 1.00 (Cat HB) <br />Average site attitude : 5, 750 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.52 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earfh Adjusted unit production : 724.32 LCY/hr <br /> Adjusted fleet production : 724.32 LCY/hr <br />, <br /> <br />JOB TIME AND COST . <br />;; <br />Fleet size : 1 Dozers) Total job time : 0. BO Hours <br />Unit cost : $0.221 /LCY Total job cost : $96 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.