My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41038
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:50 PM
Creation date
11/20/2007 10:36:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Permit File
Doc Date
9/8/1995
Doc Name
SECOND ADEQUACY REVIEW AND PRELIMINARY BOND CALCULATION 112 PERMIT APPLICATION WEBER SAND & GRAVEL W
From
DMG
To
WEBER SAND AND GRAVEL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . <br />• <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description Cost (S) <br />----- I -~---------- -------------- I ------ <br />NA No portals or shafts on site. <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description Cost (f) <br />------- I --`--------^----------------- I ------- <br />NA I No drill hole or monitoring wells on site. I <br />I I <br />I I <br />I I <br />----------------------------- ------ --- <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />------- l <br />I------ Task Description <br />-----------------------------------I- Cost (f) <br />----- <br /> <br />8 I <br />Demolition I <br />Assume 5'H *5'W *10'L mass ~ 50.18/cf <br />f45 <br />6 Seeding Per attached worksheets. f2D.472 <br /> I Fencing Addit. fencing possible future req. I <br />7 Mob/Demob Per attached worksheets. 5860 <br />Subtotal (M): 521.377 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 559.884 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No. <br />------- I Item Description <br />---------------_------------- <br />---'------ I Cost (f) <br />---------- <br />1. Public Liability Insurance.... 1. 550% of dir. I 5928 <br />2. I Contractor's Performance Bond 0. 975% of dir. I 5584 <br />3. Contractor's Profit........... 10 .00% of dir. 55.988 <br />4. Job Superintendent..Egp. op. serves as super. <br />Subtotal (A): f7,5D0 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): (61,384 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item Na. Item Description I Cost (f) <br />I-------------------- -----------I- <br />I I <br />1. I Minerals Program Adm 5.00% of cntr. 53.369 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 53.369 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 510.870 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs). 570.153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.