Laserfiche WebLink
~ f • • <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No. Task Description I Cost (f) <br />I -----------------------------------'----- I --------- <br />NA I No stream channel reconstruction required. I <br />I I <br />I I <br />I I <br />Subtotal (H): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description Cost (f) <br />5 <br />Line drainage channels with riprap. <br />Assume 37B' of ditch. lined with 224 cy riprap. I <br />Labor and equipment cost f 13.65 per cy of riprap) <br />I <br />I <br />Removal of temporary drainage control structures <br />included in Task 2. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />53,058 <br />Subtotal (I ): f3.058 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description Cost (S) <br />--------I------ -------------I---------__ <br />3 Redistribute stockpiled topsoil over 3:1 slopes. f471 <br />I I <br />4 Redistribute stockpiled topsoil over pit floor. f13,465 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />Subtotal (J): f13.936 <br />