Laserfiche WebLink
Mr. Steve Renner <br />• Page 2 <br />April 15, 1986 <br />The pre-blasting survey previously completed for the <br />Seneca II Mine remains unchanged. Upon approval of the <br />attached Blasting Schedule, the schedule will be published <br />as required by rule 4.08.3(1)(a). <br />If you have any questions on this request please contact <br />me as soon as possible. Thank you for your consideration <br />in this matter. <br />Sincerely, <br />~A.w.) <br />Uern Pfannenstiel <br />Colorado Project Manager <br />kmt <br />c: T. J. Wainwright <br />• Attachment <br />c: Curt Belden <br />Mel Granherg, OSM <br />Jim Lunan <br />Bill Perrigin <br />Leonard Shearer <br />• <br />