Laserfiche WebLink
l2 DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />V September 27, 2007 <br />John Parker <br />/ Navajo Development LLC <br />PO Box 709 <br />STATE OF COLORADO ~, <br />~~~ <br />RECENED <br />OCT 0 3 2007 <br />Division of Reclamation, <br />Mining and Safety <br />Creede, CO 81130 <br />,/ t/ ,/ <br />Re: Airport Corner Pit, File No, M-2007-057, 110c Application, Preliminary Adequacy <br />Review. <br />Dear Mr. Parker, <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bil! Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />I have finished the technical review of the permit application for the Airport Corner Pit, and have <br />a few questions about the exhibits that must be answered. I have arranged the items according to <br />the exhibit that they pertain to. <br />Exhibit B -Site Description (Rule 6.3.2 <br />The description is adequate, but mention is made of a stormwater management plan (SWMP) that <br />will be the responsibility of the "contractors" Please note that if there is a change of contractors <br />during the life of the permit, adequate control of stormwater runoff and sediment on the site must <br />continue. Therefore, please ensure that such control practices are implemented, and there is <br />regular maintenance. <br />Exhibit C -Minine Plan (Rule 6.3.3) <br />Reference was made of CDOT donating soil from their right-of--way toward your project. The <br />map and legal description appear to show that the CDOT right-of--way is outside your proposed <br />permitted area boundary, which normally would make activities in such location off-limits. If <br />you have documentation of this donation or agreement, please provide it. <br />Exhibit D -Reclamation Plan (Rule 6.3.41 <br />The plan includes a seed mix, which appears hardy and adequate for the site. Will there be need <br />for mulch or fertilizer application, in order to help stabilize the soil surface or promote vegetation <br />growth? If so, please provide those details. <br />You stated that the reclaimed slopes are to be no steeper than 2:1. Please note that much of the <br />slope surface is south-facing, which may be difficult to revegetate. I can approve the 2:1 slope, <br />but please be aware that if it is not successful, a gentler gradient may be required. <br />Rangeland and roadside areas often become weedy rather quickly after disturbance. Please <br />commit to monitoring and promptly implementing weed control, especially for noxious weeds, if <br />it becomes necessary. <br />Cont. <br />Office of Office of <br />Mined Land Reclamation Active and tnadive Mines <br />