Laserfiche WebLink
N <br />w <br />u~ <br />N <br />• • <br />TABLE 1 <br />611NIN0 APiD RCCLAPIATIO'i SCHEDULE <br />Construction Mining <br />Pit No. Began Began <br />1 --- --- <br />2 --- --- <br />3 --- --- <br />4 10/82 12/82 <br />5 3/81 9/81 <br />6 3/31 1/82 <br />* Includes associated sediment cond. <br />Backfilling, <br />Regrading and <br />Reseeding Began <br />Reclaration Complete <br />Reclamation Complete <br />Reclamation Complete <br />4/84 <br />/a2 <br />S/82 <br />.~ <br /> Recontouring "lining <br />ttining reseeding Disturbed <br />Complete Complete Acreage* <br /> <br />--- --- 14.3 <br /> <br />--- --- 30.1 <br />6/89 10/90 130.3 <br />10/83 7/84 22.3 <br />10/83 10/34 10.5 <br /> SUBTOTAL 241.7 <br />Other disturbances being permitted include the following roads: <br />From County Road to Pit 4 Haul Road Turnoff 21.8 acres <br />(7920' •~ 120' average disturbed width) <br />To Pits 1,2,3,5,6 Froin Pit 4 Turnoff 46.4 acres <br />(20,200' ~ 100' average disturbed width) <br />To Pit 4 Froin Turnoff 27.0 acres <br />(7350' @ 160' average disturbed width) <br />Subtotal 95.2 acres <br />TOTAL DISTURBAPiCE: 336.9 acres <br />