Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br /> <br />S /~ SECTION III <br />OPERATING PLAN <br />TABLE OF CONTENTS <br />2.05.2 <br />Page <br /> <br />2.05.3 <br />2.05.3(1 <br />2.05.3(2 <br />2.05.3(3 <br />2.05.3 ( 4 <br />2.05.3( 5 <br />2.05.3(6 <br />2.05.3( 7 <br />2.05.3(8 <br />Doc Date:12/11/2001 <br />Operation Plan: Estimated Area for Life of <br />Operation ........................................ <br />Operation Plan: Permit Area ..................... <br />Production Methods and Equipment ................. <br />Operation Description ............................ <br />Mine Facilities .................................. <br />Ponds, Impoundments & Diversions ................. <br />Topsoil (removal and storage) .................... <br />Overburden (removal, handling, storage).......... <br />Coal Handling Structures ......................... <br />Coal Processing Waste ............................ <br />III-1 <br />III-1 <br />III-3 <br />lII-4 <br />11I-5 <br />III-15 <br />III-28 <br />III-30 <br />III-30 <br />III-30 <br /> LIST OF FIGURES <br />FIGURE 1: Site Plan, Fuel Storage Area ..................... 111-6 <br />FIGURE 2: Haul Road to Pit 4, Detailed Plan (Maps and <br /> Exhibit Section) ............................... -- <br />FIGURE 3: Pit 4 Haul Road Profile, Typical Section and <br /> Details (Maps and Exhibit Section) ............. -- <br />FIGURE 4: Pit 4 Haul Road Sections (Maps and Exhibit <br /> Section) ....................................... -- <br />FIGURE 5: Haul Road Stability Analysis ..........:.......... III-9 <br />FIGURE 6: Drainage Basin Map ............................... III-14 <br />FIGURE 7: Typical Ditch Sections ........................... IlI-19 <br />FIGURE 8: Site Plan, Sediment Pond at Pit 4 . ............... III-22 <br />FIGURE 9: Details, Sediment Pond at Pit 4 . ................. III-23 <br />FIGURE 10: Site Plan, Sediment Pond at Pit 7 ................ III-24 <br />FIGURE 11: Details, Sediment Pond at Pit 7 .................. III-25 <br />FIGURE 12: Site Plan, Sediment Pond for Pits 5 and 6........ III-26 <br />FIGURE 13: Details, Sediment Pond for Pits 5 and 6.......... III-27 <br /> TABLES <br />TABLE 1: Mining and Reclamation Schedule .................. III-2 <br />TABLE 2: Culvert Drainage Characteristics ................. III-16 & 17 <br />TABLE 3: Drainage Ditch Characteristics ................... III-18 <br />TABLE 4: Sediment Ponds, Sediment and Flood Volumes....... III-21 <br />TABLE 5: Topsoil Volume Estimates ......................... III-29 <br /> <br />