Laserfiche WebLink
i <br />TABLE A <br />(Continued) <br />U <br />Facility <br />' Mine Office/Changehouse (Temporary <br />trailer on Parking Lot) <br />Shop/Warehouse (Prefabricated, <br />Expandable) <br />' Guardhouse <br />• Fencing <br />Fresh Water Pond #1 <br />' Potable Water Treatment Plant <br />• Potable and Fire Protection Water Tank <br />Runoff Water Ponds #1 <br />Runoff Water Ponds #2 <br />Runoff Water Ponds #3 <br />• Wastewater Treatment Plant <br />* Substation <br />Approximate Size and/or Capacity <br />24' x 60' <br />45' x 70' <br />8' x 10' <br />7,200' of 8' Chain Link <br />10.2 Acre-Feet, 240' x 240' <br />80,000 Gallons Per Day <br />175,000 Gallons <br />15.0 Acre-Feet, 240' x 400' <br />9.6 Acre-Feet, 260' x 280' <br />0.2 Acre-Feet, 100' x 120' <br />20,000 Gallons Per Day <br />Voltage In: 44 kV <br />Voltage Out: 12,470 V Underground <br />4,160 V Surface <br />* Not part of the Earthwork and Utilities Package <br />n <br />LJ <br /> <br />