Laserfiche WebLink
SECTION 01300 -SUBMITTALS <br />PARTI-GENERAL • <br />1.01 Shop Drawings, Samples, Operation end Maintenance Data <br />A. General <br />i _ 1. The Contractor shall submit to the Owner for approval all shop draw- <br />ings, operation and maintenance data and samples required by the <br />specification sections. <br />"- 2. Submittals on component parts forming a system, or that are inter- <br />related, shall be submitted at one time as a single submittal in order <br />to demonstrate that the items have been properly coordinated and <br />- will function as a unit. <br />' B. Schedule of Submissions <br />The Contractor shall make all submittals as soon as possible to allow reason- <br />able checking time, including time for correcting, resubmitting and <br />rechecking if necessary. <br />C. Shop Drawings <br />Shop drawings shall be prepared by a qualified detailer for the Contractor, <br />subcontractor, supplier or manufacturer, and shall illustrate some portion of <br />' the work, showing fabrication, layout, setting or erection details. <br />A 22" x 34" reproducible transparency with one opaque diazo print is re- <br />quired for each shop drawing. <br />D. Project Data ' <br />1. Submit manufacturer's standard schematic drawings: <br />( a. Modify drawings to delete information which is not applicable <br />to the project. <br />~ b. Supplement standard information to provide additional <br />~ information applicable to the project. <br />~ 2. Submit manufacturer's catalog sheets, brochures, diagrams, <br />L schedules, performance charts, illustrations and other standard <br />descriptive data. <br />a. Clearly mark each copy to identify pertinent materials, <br />products or models. <br />b. Show dimensions and clearances required, performance <br />~- characteristics and capacities, wiring diagrams and controls, • <br />and any other pertinent data applicable to the project. <br />OI300-I <br />