Laserfiche WebLink
<br />b) Estimating the flow in the ditch at two sampling <br />locations by measuring the geometry of the ditch and <br />depth of water. Measurements should be taken at the <br />time of sample collection. <br />Locations for the proposed sample collection are shown <br />in Plate 1 (at the entry and departure points to and <br />from the permit area). <br />• <br />7.2 GROUND WATER MONITORING <br />Ground water monitoring will concentrate on water levels <br />and quality monitoring in three installed monitoring wells within <br />the permit area. The following parameters will be monitored: <br />Monitoring Wells MW-1, 2 and 3 <br />Measure field water quality parameter monthly (p H, <br />conductivity and temperature). Record elevation of the <br />water level in the wells at the time of sampling <br />Monitoring Wells MW-1 and MW-3 <br />Sample water for complete chemical analysis semi- <br />annually. Time of sampling: before (April) and after <br />October) irrigation season. <br />The following are the suggested water quality parameters <br />n <br />to be analyzed: <br />21 <br />GEO•HYDRO CONSULTING, INC. <br />