Laserfiche WebLink
<br /> <br />• <br />• <br /> <br />Response: The surrace owners are the owners of the sand and gravel minerals ontt~tlyEU <br />site. <br />8. Mine/batch plant operators: <br />OC': ~ ~~ 7.000 <br />waif a gE50uNLES <br />Response: The Operator of the mine will be Precision Excavating, Inc. of Hayden`~~"o"E~ <br />Steamboat Springs. <br />9. Lease interests: <br />Response: There are no lease interests in the property other than those associated with <br />the mining of gravel. <br />10. Total area to be mined: <br />Response: The total area to be mined in connection with this action is approximately <br />70.4 acres. <br />11. Other existing permit approvals: <br />Response: The landowner currently holds all of the necessary permits issued by the <br />Colorado Division of Minerals and Geology to operate a sand and gravel mine at the <br />Camilletti Milner Gravel Pit, storm water and emissions permits issued by the Colorado <br />Department of Health and Environment as well as highway access permits issued by <br />the Colorado Department of Transportation. In addition, the landowner, holds approved <br />Special Use Permits and Highway Access Permits obtained from Routt County. <br />12. Expected date of commencement: <br />Response: Based upon the time frame involved in obtaining the necessary County, <br />State and Federal Permits, the Applicant anticipates commencing mining activities in <br />the winter or early spring of 2001 as soon as the necessary permits have been <br />obtained. <br />13. Expected date of termination: <br />Response: Based upon the anticipated rate of mining at 60,000 tons per year during the <br />first year of mining and building up to a projected production rate of 300,000 tons per <br />year, approximately five years into the mine life and given the reserves which have <br />been quantified at this location, it is anticipated that mining associated with Mine Blocks <br /># 1 and # 2 will cease, depending on production levels in approximately 16.1 years or <br />in the late winter or early spring of 2016. Mining in Mine Block 2A, in the event that this <br />corridor is mined, will be mined in approximately the years 2016 and 2017. This means <br />mining of the currently proposed three mine blocks will end in the year 2016-2017. It <br />must be pointed out however, that it might take longer than five years for the mine to <br />reach the 300,000 tons per year goal and perhaps there might be some years where <br />production will be less than or greater than this amount. In this event, these timetables <br />will be altered accordingly. <br />14. Total area to be mined: <br />Response: The total area to be mined or disturbed in connection with this action is <br />approximately 71 acres. This equates to a figure of approximately 70.4 acres of mining <br />excavation and approximately 0.6 acres for haul roads, etc. <br />