Laserfiche WebLink
~~ <br />J <br /> <br />12/26/79 Memo, p. 3, #3b <br /> <br />"b. Further clarification of the subsoil salvage plan <br />is needed. From what areas and what amounts of subsoil <br />will be salvaged for redistribution. This can be <br />handled in the form of a table. <br />See pp. 780-78(a)-(c), 780-80(a)-(c), 780-(81) <br />(a) and (b), 760-82(a)-(e) <br />12/26/79 Memo <br />"c. The nature of the material to <br />is not clear. A further discussio <br />handling and redistribution of thi <br />beneficial." <br />See p. 780-116(a) <br />12/26/79 Memo, p. 3, #4(a)(1) <br />"4) Operation Plan <br />be in the t/s stockpile' <br />n on the source, <br />s material would be <br />a) Section 780-1) On page 780-2 reference is made to <br />use of the Hydro-Axe in wooded areas to produce a wood <br />chip mulch. The 500 series has proved not to be adequate <br />for the EFC site, therefore, a statement addressing <br />this inadequacy should be incorporated along with any <br />additional information on the use of a larger Hydro-Axe <br />at the site. A mulching contingency plan should also <br />be given if the Hydro-Axe is not to be employed at the <br />site." <br />See pp. 780-134(a), 816-153(a)-(g) <br />12/26/79 Memo, p. 3, #4(a)(2) <br />"2. It is not clear how long redistributed topsoil <br />will remain in place before it is seeded. In view of <br />the fact that topsoil removal will be occurring during <br />the winter months when Eckman Park is first opened up, <br />the applicant should give a more detailed topsoil <br />salvage for these months and then a topsoil salvage <br />plan that will be used after this period. Refer to <br />page 780-3." <br />See p. 780-3(a) <br />