Laserfiche WebLink
<br /> <br />of 464,000 cubic yards will be replaced in five weeks during year two. <br />In the third and final year, the portal pit and parking area to the north <br />' of the pit will be retopsoiled. Four weeks will be required to replace <br />274,800 cubic yards of topsoil in year three. <br />The estimated times required are based on optimum operating conditions <br />' and do not consider adverse weather or other uncontrollable delays, <br />Revegetation <br />' Pursuant to the completion of topsoil redistribution activities, the <br />topsoiled areas will be revegetated. Revegetation operations will con- <br />t sist of chisel plowing for seedbed preparation and drill seeding on the <br />contour with the species listed in Table 1. To further control erosion <br />the areas will be contour furrowed. The seeding of plant species listed <br />on Table 1 will return the mined area to its designated poatmine landuse <br />' of pastureland. <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br />t <br /> <br /> <br />' 3 <br />