Laserfiche WebLink
<br />J <br />42 <br />documentation that a third owner (power utility) owns and designates the power poles and <br />lines to remain after mining, then a cost for removal of the poles and lines is necessary. <br />206. LCC did not include costs related to Mobilization and demobilization of equipment that <br />would be utilized for reclamation purposes. As the Reclamation Cost estimate needs to <br />account for coast the Division, or a third party, would incur to reclaim the site, these costs <br />need to be included in the estimate. Please provide mobilization demobilization costs for <br />the appropriate reclamation equipment. <br />207. Do the surface mine reclamation costs found in Table 3.02.2-I1 account for costs <br />associated with reclamation of the fills? Costs the Division foresees associated with the <br />fills includes; Rough grading, Topsoil application, final grading, seed bed prepazation, <br />seed application and mulch, and construction of permanent drainages. Please direct the <br />Division to where these costs aze found in LCC's estimate or provide this detail. <br />This concludes the Division's adequacy review. If you have questions, please call. <br />Since ley, <br />~, <br />Kent A. Gorham f <br />Environmental Protection Specialist <br />