My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13423
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:40 PM
Creation date
11/19/2007 2:41:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
3/21/1984
Doc Name
Incompleteness Letter
From
MLRD
To
STORM KING MINES INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, <br />-2- <br />Vegetation Information - Rule 2.04.10 <br /> <br />1. The vegetation lnformatlon presented 1n the appllcatlon is a summary of <br />information collected in 1981, 1982, and 1983. To complete the appllcatlon, <br />Storm King must submit the baseline vegetation lnformatlon collected in 1981, <br />1982, and 1983. <br />Fish and Wildlife Information - Rule 2.04.11 <br />1. The applicant has not provided information regarding the proposed design <br />of electric transmission and power lines to minimize raptor electrocution. <br />Electric power lines and other transmission facilities used for or incidental <br />to the mining operation must be designed in accordance with the guidelines set <br />forth 1n the Environmental Criteria for Electrical Transmission Systems (USDI, <br />USDA, 1970), or 1n alternative guidance manuals approved by the Division. <br />Distribution lines must be designed and constructed in accordance with REA <br />Bulletin 61-10, Powerline Contacts by Eagles and Other Large Birds, or in <br />alternative guidance manuals approved by the Division. <br />Mine Facilities - Rule 2.05.3(3) <br />1. Storm King has not submitted road drainage ditch designs or supporting <br />calculations to show that the ditches are capable of passing the 10-year, <br />24-hour peak flow while maintaining a minimum of 0.3 feet of freeboard. In <br />addition, supporting calculations for all road and loadout area railroad <br />culverts must be submitted. <br />2. The application does not contain a description of the fan facility. A <br />description meeting the requirements of Rule 2.05.3(3) and the location(s) of <br />any fan(s) on the appropriate map must be incorporated Into the permit <br />application. <br />3. The application contains no descrtptlon of light-use roads. Light-use <br />roads will evidently be constructed along the coal slurry pipeline, the <br />make-up water pipeline, to monitoring stations, and to other facilities. <br />A description and appropriate maps meeting the requirements of Rule 4.03.3 <br />must be incorporated into the permit. <br />4. The application contains no descrtptlon or reclamation plan for that <br />portion of the rail system directly associated with the loadout. A discussion <br />meeting the requirements of Rule 2.05.3(3)(c) must be incorporated into the <br />permit appllcatlon. <br />Ponds. Impoundments, and Diversions - Rule 2.05.3(4)_ <br />1. The application contains only a brief description of the slurry holding <br />ponds. A discussion with appropriate maps and cross-sections meeting the <br />requirements of Rules 2.05.3(4) and 4.05.9 must be Incorporated in the <br />application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.