My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13421
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:40 PM
Creation date
11/19/2007 2:41:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Application Correspondence
Doc Date
12/21/1992
Doc Name
CARBON JUNCTION MINE OAKRIDGE ENERGY INC FILE NO C-92-080
From
DARRY A FERGUSON
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 8. Blasting costs for reducing highwalls (preferably form contractors <br />certified in this capacity). <br />9. Demonstrations/predictions of infiltration rates/recharge rates. <br />10. Designs for the pond in accordance with SCS guidelines. <br />Since this information is not available at this time, a bond estimate that <br />would entail filling of this maximum disturbance pit with overburden is <br />required. <br />The vegetation costs, using the specifications set in the old permit was in <br />excess of $1,600.00 an acre. This included mulching at 2 ton per acre, <br />netting on steep slopes, drilling, seeding, fertilizing, discing and <br />harrowing. Your estimated cost pre acre is $72.50. This large <br />discrepancy needs to be addressed. <br />Re~nse <br />All references to bonding will be submitted in the upcoming submittal. <br />uestion <br />2.05.4(2)(e)(ii) Page 5-28(2)(3)(ii) and (iii) makes reference to deciding how many woody <br />• plants will be replaced. This should be updated to described how many <br />actually will be replaced. 1,000 live stems/acre is the normal minimum <br />standard. The operator will need to describe in detail how many shrub <br />clumps or islands will be planted, how they will be planted, where they <br />will be planted, etc. A map with location would be appropriate. <br />Additionally, what are the woody plant success standards? <br />The operator needs to provide a breakdown of the topsoil stockpile seed <br />mix (total rate and rate of each species). Page 5-29(iii) and (iv) should <br />contain a commitment to crimping the straw mulch or using netting or <br />using a tackifier. <br />Page 5-29(v) will need to have a detailed week control plan added to this <br />section. This should include: <br />a. target weeds <br />b. control methods <br />c. types and rates of pesticides used <br />d. when control measures will be implemented <br />e. etc. <br />Page 5-30(vi) -This section should contain a clear success standard for <br />• cover, production, diversity and woody plant density on all disturbed <br />areas. We will not approve the permit without this or a stipulation to <br />provide it. <br />10- <br />DEC 2 2 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.