Laserfiche WebLink
<br />1 <br />1 <br /> <br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />t <br /> <br /> <br /> <br /> <br /> <br /> <br />SAMPLING <br />Generally, sampling will be conducted at <br />the same locations where profile descriptions <br />aze made. A minimum of two <br />profile/sampling locations will be located <br />within each mapping unit within the <br />boundazies of the surface disturbance azeas. <br />A soil map with identified locations will be <br />submitted to CDMG for approval prior to <br />sampling. 'I~vo quart samples of each genetic <br />horizon will be collected from the exposed <br />profile and double-bagged in polyethylene <br />bags for shipment to the lab for analysis. <br />ANALYSIS <br />Each collected soil sample will be <br />analyzed for the following parameters: <br />pH; <br />Pazticle size (texture); <br />Saturation percentage; <br />Conductivity; <br />Soluble Ca, Mg, and Na; <br />SAR; <br />Boron; <br />Selenium (if indicators present); and <br />Organic Matter. <br />Analysis would be performed in accordance <br />with the procedures referenced in the CDGM <br />Soil and Overburden Guidelines by a lab <br />approved by CDGM. <br />SOIL SALVAGE AND <br />REDISTRIBUTION <br />The mapping, profile description, and <br />analysis data will be used to identify the <br />suitability of each mapping unit for salvage. <br />The chemical suitability criteria used will be <br />those identified in of the Soil and <br />Overburden Guideline and subsequent <br />revisions. A topsoil salvage map will be <br />prepazed showing the salvageable depths <br />within each mapping unit. This depth will be <br />multiplied by the corresponding acreage to <br />determine volume. A stripping plan will be <br />developed identifying lifts, special handling <br />(if necessary), and the location and size of <br />topsoil stockpiles. A redistribution plan will <br />be prepared that will identify the depth of <br />redistributed topsoil and the procedures that <br />will be used to replace the soil and prepaze it <br />for reclamation. <br />17 <br />