Laserfiche WebLink
Mr. Jim Stover • • <br />November 20, 1996 - Adq. Rev./Bowie No. 2 <br />Page 6 <br />2.05.6(61 -Subsidence Survey. Subsidence Monitoring and Subsidence Control Plan <br />EXHIBIT IS -Subsidence Prediction <br />1.2 Mining Schedule and Rate of Subsidence - <br />Paragraph 2 -This issue has been referred to Jim Pendleton for review. <br />2.3 Groundwater - <br />Paragraph 1 -Resolution of this issue is pending response from the SEO regarding water <br />rights. <br />2.4 Buildings and Structures - <br />Paragraph 1 -Response accepted. <br />Mass Movement Features -Landslide <br />Paragraph 1 -Response accepted. <br />2.06.8 -Alluvial Val1e~F7oors <br />91a) Response accepted. <br />2.10 -Maps and Plans <br />91b) Response accepted. <br />3.02.2 -Bond Amount <br />91c) Thank you for the well data list. Does this list include all open drill holes within the proposed <br />permit boundary? If not, please revise the list to include all holes. <br />A fuuil bond estimate will be derived once all adequacy concerns are resolved. <br />Thank you for your continued patience and cooperation. Please call with any questions. <br />?rotection Specialist <br />DAB/gaw M:~~~~gew~ow~~.~ <br />