Laserfiche WebLink
Mr. Jim Stover • • <br />November 20, 1996 - Adq. Rev./Bowie No. 2 <br />Page 5 <br />63b) Response accepted. <br />2.05.3(7) -Coal Handling Structures <br />68) Additional information is needed. This issue is pending.adequate resolution of the geotechnical <br />concerns most recently addressed in our November 18,1996 letter to BRL. <br />Voltune IV - "Coal Mine Waste Bank Final Design For Bowie No. 2 Mine" <br />70) Response accepted. <br />4.1.4) Response accepted. <br />4.1.5) Response accepted, pending verification of final Colorado Department of Transportation <br />Highway Access permits. <br />4.3.2) Resolution pending. Please forward the pertinent information as soon as it is available. <br />2.05.4(2)(cl - Backfilling and Grading <br />71) Additional response is required. Refer to our November 18, 1996 letter, regarding pending <br />geotechnical concerns. <br />72) Response accepted. <br />2.05.4(2)(d) -Topsoil Redistribution <br />72a) Response accepted. <br />2.05.4(21(8 -Disposal of Debris. Acid-forming and To~dc-forming Materials <br />77) Response accepted. <br />2.05.4(2)(8) -Drill Holes <br />77a) Response accepted. <br />20.5.6(3) -Protection of Hydrologic Balance <br />82a) This issue has been forward to Jim Pendleton for review. <br />20.5.6(3)(b)(iii) -Probable Hvdrologic Conseouences <br />84) Response accepted. <br />86) Response accepted. <br />