Laserfiche WebLink
"v • "r 'r <br />-2- <br />- (Page 4 of the original findings draft should be included in its original <br />form. The stipulation contained on pa 9e 5 of the original draft should be <br />deleted and replaced with the following revised stipulation.) - <br />Stipulation: <br />THE DIVISION DIRECTS PERMA RESOURCES, INC., TO CONTINUE CONSTRUCTING <br />THE SPOIL FILL TOEDRAI!/ AT THE AIARTINEZ STRIP AS ORIGINALLY DEPICTED <br />AND DESCRIBED IN THE TEXT AND FIGURES OF TIIE REPORT ENTITLED "SPOIL <br />PILE SLOPE STABILITY ANALYSIS, FISHING AREAS NO. I THROUCI! NO. 4, <br />CHIMNEY ROCK COAL COIfP.ANY, NEAR FAGOSA SPRINGS, COLORADO", PREPARED <br />BY CTS,/TNOPIPSON, INC., DATED AUGUST 31, 1979 AND SUB717TTED BY PERPIA <br />RESOURCES, I?1C. , AS A MODIFICATION TO ITS OP.IGINAL PERf1IT P70. 78-252 <br />FOR THE IfART7lJEZ STRIP. <br />FURTHER, I!J ORDER TO CLAR IFS' THE SPECIFIC LOCATION AND DESIGN OF THE <br />SPOIL FILLED TOEDRAIN NJITff71/ THE FINAL SOUTIifJESTERN PORTION OF THE <br />AIARTINEZ STRIP PIT, THE DIVISION DIRECTS PERAIA RESOURCES, INC., TO <br />PREPARE A SPECIFIC PLAN RND CROSS-5'ECTIOAI DEPICTING THE TOEDRAIN <br />AND ITS OUTFACES TO BE CONSTRUCTED IN THAT PORTION OF THE P.IT. THAT <br />TOEDRA IN SHALL f7EASURE AT LEAST 4 FEET DEEP AND 15 FEET WIDE AND <br />' SHALL EXTEND THE ENTIRE. LENGTH OF THE DOWNDIP BOUNDARY OF THE <br />FINAL EXCAVATED CUT. THAT TOEDRAIN SHALL BF. INSTALLED AT AN ELE- <br />VATION SUFFICIENT TO ALLOW OUTFACES TO DRAIN AT A MINI..^]UM GRADE <br />OF 1% TOWARD THE NEIGHflOR ING STOLLSTEIPIER CREEK VALLEY. THE <br />SPECIFIC PLAN AND CROSS-SECTIOfI SHALL BE SUBMITTED TO 'THE DIVISION, <br />FOR REVIElJ AND RPPROVAI., NO LATER THAN 30 DAYS FOLLOfJING ISSUANCE <br />OF THE PERMIT. <br />FURTHER, IF PERIfA RESOUPCES, INC., DESIRES 7'O PURSUE THE DELETION <br />OF THE SPOIL FILL TOEDRAIN, THE COhIPANY SHALL PREPARE AN APPROPRIATE <br />PROJECTION OF THE POST-MINING WATER TABLE WITHIN THE BACKFILLED <br />SPOIL. THIS ANALYSIS, INCLUDING IfODELING OF THE POST-,,"•17NING WATER <br />TABLE, SHALL BE SUBh12TTED TO THE DIVISION FOR REVIEW AND APPROVAL. <br />CONSTRUCTION OF THE SPOIL PILE TOEDRAIl7 SHALL CONTINUE AS APPROVED <br />UNTIL THE DIVISION SPECIFICALLY' APPROVES AN APPROPRIATE PLAN <br />RF.VIS7077, IN IJRITING. <br />