My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13254
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:30 PM
Creation date
11/19/2007 2:39:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Application Correspondence
Doc Date
7/22/1982
Doc Name
AMENDED GEOTECHNICAL FINDINGS FOR THE MARTINEZ STRIP
From
MLR
To
MIKE LONG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"v • "r 'r <br />-2- <br />- (Page 4 of the original findings draft should be included in its original <br />form. The stipulation contained on pa 9e 5 of the original draft should be <br />deleted and replaced with the following revised stipulation.) - <br />Stipulation: <br />THE DIVISION DIRECTS PERMA RESOURCES, INC., TO CONTINUE CONSTRUCTING <br />THE SPOIL FILL TOEDRAI!/ AT THE AIARTINEZ STRIP AS ORIGINALLY DEPICTED <br />AND DESCRIBED IN THE TEXT AND FIGURES OF TIIE REPORT ENTITLED "SPOIL <br />PILE SLOPE STABILITY ANALYSIS, FISHING AREAS NO. I THROUCI! NO. 4, <br />CHIMNEY ROCK COAL COIfP.ANY, NEAR FAGOSA SPRINGS, COLORADO", PREPARED <br />BY CTS,/TNOPIPSON, INC., DATED AUGUST 31, 1979 AND SUB717TTED BY PERPIA <br />RESOURCES, I?1C. , AS A MODIFICATION TO ITS OP.IGINAL PERf1IT P70. 78-252 <br />FOR THE IfART7lJEZ STRIP. <br />FURTHER, I!J ORDER TO CLAR IFS' THE SPECIFIC LOCATION AND DESIGN OF THE <br />SPOIL FILLED TOEDRAIN NJITff71/ THE FINAL SOUTIifJESTERN PORTION OF THE <br />AIARTINEZ STRIP PIT, THE DIVISION DIRECTS PERAIA RESOURCES, INC., TO <br />PREPARE A SPECIFIC PLAN RND CROSS-5'ECTIOAI DEPICTING THE TOEDRAIN <br />AND ITS OUTFACES TO BE CONSTRUCTED IN THAT PORTION OF THE P.IT. THAT <br />TOEDRA IN SHALL f7EASURE AT LEAST 4 FEET DEEP AND 15 FEET WIDE AND <br />' SHALL EXTEND THE ENTIRE. LENGTH OF THE DOWNDIP BOUNDARY OF THE <br />FINAL EXCAVATED CUT. THAT TOEDRAIN SHALL BF. INSTALLED AT AN ELE- <br />VATION SUFFICIENT TO ALLOW OUTFACES TO DRAIN AT A MINI..^]UM GRADE <br />OF 1% TOWARD THE NEIGHflOR ING STOLLSTEIPIER CREEK VALLEY. THE <br />SPECIFIC PLAN AND CROSS-SECTIOfI SHALL BE SUBMITTED TO 'THE DIVISION, <br />FOR REVIElJ AND RPPROVAI., NO LATER THAN 30 DAYS FOLLOfJING ISSUANCE <br />OF THE PERMIT. <br />FURTHER, IF PERIfA RESOUPCES, INC., DESIRES 7'O PURSUE THE DELETION <br />OF THE SPOIL FILL TOEDRAIN, THE COhIPANY SHALL PREPARE AN APPROPRIATE <br />PROJECTION OF THE POST-MINING WATER TABLE WITHIN THE BACKFILLED <br />SPOIL. THIS ANALYSIS, INCLUDING IfODELING OF THE POST-,,"•17NING WATER <br />TABLE, SHALL BE SUBh12TTED TO THE DIVISION FOR REVIEW AND APPROVAL. <br />CONSTRUCTION OF THE SPOIL PILE TOEDRAIl7 SHALL CONTINUE AS APPROVED <br />UNTIL THE DIVISION SPECIFICALLY' APPROVES AN APPROPRIATE PLAN <br />RF.VIS7077, IN IJRITING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.