Laserfiche WebLink
<br />agree with the shape correction used for ditch P2, which rune through <br />Culvert 2. This needs to be corrected. <br />RESPONSE: <br />Table Sa of Eahibit 3 has been revised accordingly. <br />5. Map 4, Hydrology, shows Ditch P1 entering the Middle Creek Detention <br />Basin at its western edge. Map 3, Permanent Sediment Control Plan, shows <br />the same ditch entering the pond close to its east end at the edge of the <br />pond embankment. Please clarify. <br />RESPONSB: <br />Map 20a, Permanent Sediment Control Plan, has been revised <br />accordingly. <br />6. Map 4, Hydrology, does not show the location of Ditch P2. <br />RESPONSE: <br />Map 4a, Energy Mine 3 Hydrology, has been revised accordingly, <br />D. Haul Roads <br />1. The haul road cross-sections show the fill slopes as lh:ly elopes. <br />According to Rule 4.03.1(3)(d), this slope is too steep unless it can be <br />demonstrated that this elope is stable. <br />-35- <br />