Laserfiche WebLink
13. Pages 2.05.3-IS and 2.05.3-16 discuss the Crushing and Screening Plant. No <br />information, however, is given regarding the buildings concrete pad or footers. Please <br />provide the concrete pad and footer information is the discussion of the Crushing and <br />Screening Plant and resubmit the appropriate page (s). <br />Northfield Response: Details were added to permit text. <br />DRMS: Response accepted. <br />14. Page 2.05.3-IS discusses the Truck Scale. There are no dimensions or construction <br />given for the Truck Scale. Additionally, there is no discussion as to whether there is a <br />scale house at the Truck Scale. Please provide a detailed description of the truck scale <br />on this page and resubmit the page. If there is a scale house, please include this <br />information on the updated page. <br />Northfield Response: Additional details and dimensions were added. <br />DRMS: Response accepted. <br />15. Page 2.05.3-18 briefly discusses Topsoil Stockpiles. Please include a reference of the <br />page(s) in Section 2.05.4 where additional topsoil information can be found. <br />Northfield Response: Reference was added to permit text. <br />DRMS: Response accepted. <br />16. Pages 2.05.3-18, 2.05.3-19 and 2.05.3-20 discuss the mine's haul road, access roads and <br />light-use roads. The pages include brief descriptions of these roads. The Division, <br />however, needs more detailed information for bonding purposes. Please provide the <br />Division with all of the road designs and profiles to aid in the determination of cut and <br />fill volumes for final reclamation. <br />Northfield Response: Exhibit AA was added. <br />DRMS: Response accepted. <br />17. Page 2.05.3-ZD of the Northfield application discusses the Power Transmission Lines and <br />Associated Facilities. There is no information, however, regarding the power lines or the <br />substation. Please include information regarding the new power transmission lines at <br />the Northfield Mine. Please include the length of the new lines and the number and type <br />of poles to be used. Please include these on the appropriate map. Additionally, please <br />include information regarding the proposed substation. Please include the dimensions of <br />the substation, the pad composition (concrete or gravel pad or other construction), the <br />fencing used and any additional information. Please include the substation information <br />on the appropriate map. Please resubmit Page 2.05.3-20 with the above requested <br />information. <br />