Laserfiche WebLink
<br />required in both the current and proposed permit. <br />Please verify who is undertaking all aspects of the current water <br />monitoring program as approved in permit C-80-004. <br />Reclamation Schedule - Rule 2.05.4 <br />30. Soil Testing <br />The timetable given on Table 17-2 seems to indicate that soil <br />testing will take place the second or third year after seeding. <br />Please explain why soil testing is to take place after rather than <br />before seeding. <br />Hackfillina and Grading - Rule 2.05.4(2)(c) <br />31. Cross Sections <br />Section 2.05.4(2)(c) states that Peabody is required to produce a <br />plan for backfilling and grading the proposed permit area. The <br />Division needs appropriate cross sections that are typical and <br />represent the final surface of the proposed permit area. <br />Please submit to the Division an appropriate cross section of the <br />existing and final surface configuration of the proposed permit <br />area in accordance with Section 2.05.4(2)(c). <br />32. Small Depressions <br />Page 1, Tab 18 notes that "small depressions" will be left after <br />backfilling and grading. <br />Please characterize these depressions, including their estimated <br />size, and justify leaving them in terms of Rules 4.05.9 and 4.14.2. <br />33. Postminina Tovoaraphv and Vegetation <br />It was not clear at first viewing that Exhibit 18-1 was referring <br />to affected lands only, not to the entire permit area, as the <br />unaffected area within the rail loop was not designated as <br />unaffected. <br />Please consider adding the term Affected Lands to the title of <br />Exhibit 18-1. <br />