Laserfiche WebLink
J <br />Please submit designs to the Division for its approval for any <br />changes made to the existing road. Also make changes to page 3, <br />Tab 12 and any relevant maps. Please include bonding estimates and <br />culvert information. <br />[A submittal was received by the Division on February 10, 1993 to <br />address this concern] <br />25. Access Roads and Light Duty Roads <br />The permit states (page 3) that no access or light duty roads exist <br />within the permit area. <br />Please verify that there are not access or light duty roads within <br />the permit area. <br />26. Truck Loadout <br />Peabody has informed the Division that a truck loadout will be <br />added to the loadout. <br />Please submit designs to the Divisions for its approval and make <br />any necessary changes to pages and maps in the permit. Please <br />include bonding estimates. <br />27. Sewage Treatment <br />Page 7, Tab 12 of the application states that waste water from the <br />facilities will be put through a settling pond. Exhibit 12-1 shows <br />a leach field. <br />Please inform the Division of the correct situation and make the <br />appropriate changes to pages and maps. <br />Hydroloaic Monitoring Plan <br />28. Location of Uogradient Shallow Well <br />The Division is unclear as to the location of HGDAL. <br />Please verify the location of HGDAL, as shown on Figure 13-1, <br />possibly by the inclusion of all monitoring sites on a larger scale <br />map. Please also verify that this well will characterize the <br />shallow aquifers above the loadout. <br />29. Surface and Ground Water Monitoring <br />Page 5, Tab 13 states that Peabody is responsible for NPDES <br />monitoring after November 6, 1992. The Division is unclear as to <br />who is responsible for undertaking the rest of the monitoring as <br />