My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13113
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:24 PM
Creation date
11/19/2007 2:38:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Application Correspondence
Doc Date
11/25/1985
Doc Name
STABILITY OF SPOIL PILES AT PORTALS OF ACCESS DRIVES
From
TERRA THERMA INC
To
NEW CASTLE ENERGY CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-5- <br /> <br />b) A final written report, no later than 30 days after the end of <br />that period for which Notice of Intent was filed or written <br />approval was granted. <br />c) A Drill Hole Abandonment Report, within 60 days of abandoning a <br />drill hole. <br />(THESE THREE REPORT FORMS ARE AVAILABLE FROM THE DIVISION.) <br />4) The Division nay conduct periodic inspections of all coal <br />exploration activities and issue Notices of Violation to any person <br />who is in violation of the Act, or any conditions of exploration <br />approvals. (Rules~5.01.3 and 5.02.2) <br />To the best of my knowledge and belief, all the information presented in this <br />application is true and correct, <br />Sam S. Arentz, III. <br />Print Name and Title of Representative <br />Vice - President/ Operat' ns <br />Date: July 7, 1983 - <br />S' not e of Nu oriz Represent,st've <br />Division Procedures: <br />1. The Division shall review the complete Notice of Intent to Conduct Coal <br />Exploration and shall make a determination within two weeks of the filing of <br />such complete Notice, whether the proposed exploration will substantially <br />disturb the natural land surface, and if so, whether the proposed activity <br />qualifies as coal exploration or surface coal mining operations. The Uivision <br />shall immediately notify you in writing of its determination. The <br />determination of substantial disturbance shall include, but not be limited to, <br />consideration of the performance standards listed in Rule 4.21.4. If the <br />Division determines that the proposed coal exploration activities will <br />suostantially disturb the natural lantl surface, you must comply with Rule <br />4.21. (NOTE: If you feel that the activities will substantially disturb the <br />land, as "substantially disturb" is defined by Rule 1.04, you may attach or <br />enclose your exploration and reclamation plan as it complies with Rule 4.21.) <br />2. If the Division determines that the proposed coal exploration activities <br />qualify as surface coal mining operations, the application shall be returned <br />to the person with the written determination. The person shall be informed of <br />his rights to appeal such determinations and that conduct of any activities <br />included in the application are prohibited until a valid mining and <br />reclamation permit is obtained. <br />Dcc. No. 2951 <br />(Rev. 5/83) <br />
The URL can be used to link to this page
Your browser does not support the video tag.