Laserfiche WebLink
r Page 2 <br /> <br />centerline of the dam and the brush removal. The placement of coal slack and <br />the placement of material from trench cuts in the draw made the recovery of <br />topsoil impossible. The disposal of the slack in the sediment pond area has <br />been a larger job than expected. <br />If there are any questions, please feel free to contact me. <br />Yours truly, <br />Larry M. Reschke <br />Mine Engineer <br />LR/kb <br />