Laserfiche WebLink
-6- <br />Stipulation No. <br />4IITHIN 60 DAYS OF CONSTRUCTING A SEDIMENT POND THE OPERA 4tlR SHALL <br />1) SUBMIT CERTIFIED AS-BUILT DESIGNS FOR THE PONDS SHO[JING DIMENSIONS <br />AND ELEVATIONS AND 2) .SUBMIT A REPORT CERTIFIED BI' A QUALIFIED REGISTERED <br />PROFESSIONAL ENGINEER THAT STATES THAT THE POND WAS CONSTRUCTED <br />ACCORDING TO THE APPROVED PLAN CONTAINED IN THE APPLICATION. <br />With the acceptance of the above stipulation the Division finds the <br />application in compliance with this section. <br />