My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13081
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:23 PM
Creation date
11/19/2007 2:37:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
4/28/1981
Doc Name
GRAND MESA PERMIT APPLICATION FN C-034-81
From
MLR
To
GRAND MESA COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />PRELIMINARY ADEQUACY REVIEW <br />Grand Mesa Coal Company - Red Canyon Mine <br />April 28, 1981 <br />2.03 _ Legal and Financial Requirements <br />1. Rule 2.03.4(4) requires a statement of any current or previously held <br />coal mining permits. Since Grand Mesa currently holds a permit, it should <br />be indicated along with any prior permits. <br />2. Rule 2.03.5 requires a listing of each notice of violation received in <br />the three year period prior to .the application date. This should be pro- <br />vided. <br />2.04.3 General Requirements: Site Description and Land Use <br />Tn fn rmatinn <br />1. Rule 2.04.3(2)(a) requires a narrative of the existing Sand uses. A <br />more detailed description should be provided relative to the information <br />provided on the Iand use map. The applicant should indicate whether areas <br />designated as farmland are dryland or irrigated and specify what crops are <br />grown. It is assumed that portions of the permit area not designated as <br />farmland or pastureland are rangeland. A brief discussion regarding <br />the seasonal use of the area by wildlife and livestock (if any) should be <br />provided. <br />2. Rule 2.09.3(2)(b) requires an estimate of the productivity of those <br />areas affected or to be affected by surface operations before any mining. <br />SCS range site productivity information would be sufficient. <br />2.04.4 Cultural Resources Information <br />Comments will be forwarded to Grand Mesa. <br />2.04.6 Geology Description <br />I. The nature of the coal and interburden of the seams to be mined should <br />be discussed in further detail. The local fracturing, cleating, and the <br />presence of stringers should be mentioned in the plan. A general geologic <br />description of the Iles formation of the Mesa Verde Group should be provided. <br />2. Drill core data has been submitted for only one test hole (NGE-80-3C). <br />Lithologic logs for all drill holes used in the preparation of the geologic <br />cross-sections should be submitted with the plan. <br />3. Additional cross-sections, as required by 2.04.6(2)(a)(ii) are needed <br />to characterize the geology of the entire permit area. Areas of potential <br />influence to the alluvial aquifers should be delineated with East-West <br />cross-sections. The portion of the mine in Sections 12 and 13 should be <br />covered with a North-South Cross-section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.