Laserfiche WebLink
r..: <br />Bob Liddle <br />November 18, 1982 <br />Page 2 <br />that location were not correctly maintained to offer the sediment <br />control that was intended. Both of these concerns will be resolved <br />during the construction period mentioned in Item 2. <br />Item 4 - The federal inspector noted that some general upgrading in <br />the ditches along side the road should take place. Mr. Mitchell <br />informed me that this clean up work would be performed during the <br />construction phase mentioned above. <br />Item 5 - The federal inspector noted that the haul road certification <br />or sediment control certification were not filed at the office. Both <br />of these items have been committed to during the permit application <br />process and both items are involved in this final engineering and <br />construction phase at the sight. The certifications will be completed <br />after the sight is upgraded to meet the terms of the permit application <br />and those records will be filed at the mine office. <br />All the above items will be completed by December 10, 1982 and seeding of <br />the areas mentioned in the previous inspection report of Mined Land Reclamation <br />will be completed shortly thereafter as snowfall allows. <br />Yours truly, <br />Wl9..Q~.•'~ 5. 1 ~ <br />William S. Tate <br />Senior Engineer <br />/lr <br />cc: Julian Mitchell <br />Marvin Adam <br />