Laserfiche WebLink
<br />Jim Herron <br />CMLR <br />Page 3 <br />November 11, 1980 <br />RECLAMATION COSTS <br />~.: ~,; <br />„~ ' ~'` .. <br />~; ±,~ <br />- , ~.: <br />,a~,~y, ~ ~;q~' <br />3 ,.v' <br />' ~. <br />-~' ~:• <br />,.., -, <br />~.; <br />~~ . ,~` <br />ry ~ a `.~ t <br />~ ~r-„ .. <br />t <br />.°i~ ~h; <br />air',: ;, <br />~r N F• <br />~,- , . <br />~;. <br />., < :. <br />.~. <br />,.,..,,. <br /> <br />~J ~gp ~ <br />is r ~~ '~1. ~'~,+x~ ~ ~~~ •. ~M M <br />Reclamation costs of this waste disposal area would be mini~tyx@S;ortly.ith@ A <br />Horizon topsoil need be replaced. To replace 3,081 cubic yards°Of',to~soil,at 5.60 <br />per cubic yard, the cost of topsoil replacement ("A" Horiion)t'1f=lSttMlt+@d t0 be <br />$2,500. Replacement costs of 12,000 cubic yards of "B" Hor'1ion.1S @Stirytld;.t0 <br />be $7,200. Grading is included in the topsoil replacement CoStS.*'-> <br />,, ~.~ <br />Reseeding is estimated to cost approximately 32,800 if hydroseeded.i0r;~~1,600 if <br />drilled. Both prices include fertilizer and mulch. ? . <br />Total estimated reclamation costs for topsoil replacement, seeding, fertili2ing <br />and mulching, based on highest estimates, is $12,500. <br />~-t; ~„ <br />r, <br />If you have any questions, please feel free to call me. ~.,; , <br />Sincerely, <br />~~Q~~ ~~ <br />Darrel Hespe <br />Environmental Coordinator <br />DH:sh <br />ENCS <br />