Laserfiche WebLink
s <br />.~ .; 1 <br />IN kF:l•LY Hk:F't:R 'In <br />I <br /> <br />United States Department of the Interior _ <br />GF:OI,OGICA1. tiUR1'E\' 12345C)~ ~~ <br />;• . <br />Box 25046 Stop 602 C-033301 o'S, ~ <br />- ~ llcnver Federal Ccmrr ~ ~ o~mj c ` ~ <br />Dcnvcr, Col uradu ROYYS ti 2~ C 2 <br />June 13, 1979> crs,CiQ~ ro <br />Memorandum <br />To: Regional Director, Office of Surface Mining, Denver, CO <br />Attn: John Hardaway <br />From: Acting Area Mining Supervisor, CRMA <br />Subject: Mining plan, Blue Ribbon Mine, coal lease C-033301, <br />Sunflower Energy Corporation (sublessee) <br />This office has reviewed the mining and reclamation plan dated <br />May 21, 1979, for the underground Blue Ribbon mine as to the <br />development, production and resource recovery and protection. <br />To make the plan of mining operations satisfactory, the following <br />information is needed: <br />,~ Narrative Section - Minis Plan <br />Discuss development of the main entries giving number of <br />entries, entry widths and centerline distances. <br />Discuss development of panel entries off the main entries, <br />giving sequence of development and mining of the panels. <br />Discuss typical plan for mining coal within the panels. <br />Will rooms be mined on both sides of panel entries or one side <br />only? Will rooms be mined by advance or retreat mining methods? <br />Give rationale for 60-foot wide panel barrier pillars <br />(40- to 50-foot width is usually adequate). <br />Give average planned rate of production, daily and annually. <br />Mine Layout Map <br />The mine plan map should show all the measurements for <br />development of the main entries, panel entries, rooms and barrier <br />pillars. The map should show sequence of developing panel entries, <br />sequence of mining panels and a typical plan for room and pillar <br />mining of a panel. The plan should designate areas to be mined <br />annually for at least the first 5 years of operations. <br />