Laserfiche WebLink
Revisions on pages 3 and 5 in Teb 13 address this question. <br />'Ta6 13, page 1 has been revised to include a reference to new Attachment 13.1; and Teb <br />13, page 2 (Figure 13-1) has been revised to reflect the incidental permit boundary <br />change. <br />•Tab 15, page 1 was revised to include a reference to new Attachment 15-1 <br />RECLAMAT IOM SCREDULE - RULE 2.05.4 <br />30. Soil Testing <br />Soil testing procedures have been ctarif ied in Table 17-2 of Tab 17 and Page 10 of <br />Tab 19. Soil testing and amendment application, when needed, will occur prior to <br />seedbed preparation for phosphorus and after the second or third growing season for <br />nitrogen. The revised text on Page 10 of Tab 19 and the existing Fertilization <br />section in Tab 20 explain soil testing and amendment application procedure in more <br />detail. <br />'Tab 19 pages 2, 3, 5 and 8 have been modified to account for soil reconstruction <br />necessitated by haul road RG2 and the incidental permit boundary change. <br />gACKFILLING and GRADING - RULE 2.05.4 (Z] (c) <br />31. Cross Sections <br />These cross sections have been included with this submi ttel and are referenced on <br />revised page 1. Please refer to new Exhibit 18-2. <br />32. Small Depressions <br />Reference to small depressions in Tab 18 pages 1 and 2 have been deleted. <br />33. Postminino Tooooraohv and Vegetation <br />The legends for Exhibits 17-1 and 18-1 have been modified to show unaffected lands <br />within the permit area. <br />AIR RUALITT CONTROL PLAN - RULE 2.05.6(1) <br />v <br />