My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12875
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:14 PM
Creation date
11/19/2007 2:35:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Application Correspondence
Doc Name
RESPONSE TO PAR HAYDEN GULCH LOADOUT C-92-081
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
explanation in the map legend. <br />19. Possible Presence of Threatened and Endangered Species <br />The Threatened or Endangered Species section of Tab 11 and Tab 21 (Fish and Wildlife <br />Plan) have been revised to address the species of concern. <br />20. Protected Stream Status <br />The Fishes and Other Aquatic Organisms section of Tab 11 has been revised to include <br />en evaluation of the benthic invertebrates in Dry Creek with regard to fulfillment <br />of the requirements for a biological community as defined by Rule 4.D3.18 (3). The <br />evaluation has resulted in the need for a stream buffer zone. Tab 14 page 3, and <br />Teb 21 have been revised to incorporate protection measures in the stream buffer <br />zone. <br />21. U.S. Fish and Wildlife Concerns <br />Responses to the U.S. Fish and Wildlife concerns have been incorporated into Tabs 11 <br />and 21 of the PAP. <br />•Tab 11, page 2 was revised to adjust the acreage of the Disturbed Areas to accommodate <br />the incidental permit boundary change, and the USFWS letter was added to Attachment 11-1. <br />FACILITIES. SEDIMENT CONTROL end OPERATIONS PLANS <br />22. Pond Caoaci[v <br />The wording has been clarified on page 1, Teb 12. Pond 002 only has one spillway. <br />23. Diversion Ditches <br />This issue was resolved in a telephone conversation between the Division and Peabody <br />on March 03, 1993. A commitment to design relative structures is on page 2, Tah 12. <br />The language has been clarified on page 3 to reference ditch designs for haulage <br />road HGLF-HR2. <br />24. Haul Roads <br />This issue has been resolved. Bond estimates are now included in Tab 23. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.