Laserfiche WebLink
Mr. Geoffrey P~aunders • A <br />• January 31, 1980 <br />• Page 4 <br />1. Revising, if possible, those ponds and related ditch <br />configurations which are over 10 feet in height, pur- <br />suant to Colorado State Engineer requirements; <br />2. Development of specific alternatives for handling the <br />runoff from the areas tributary to the sumps; <br />3. Identify and size all crossings requiring the installa- <br />tion of culverts; <br />4. Continue finalization work, as directed, upon receipt of <br />vour comments and scheduling for both the Kerr and Mine <br />No. 3 projects. <br />If you should have anv questions concerning this material, <br />please feel free to contact me, at your convenience. <br />Very truly yours, <br />LEONARD RICE CONSULTING WATER ENGINEERS, INC. <br />Gordon W. Fassett <br />Project Engineer <br />GWF/sw <br />307EFC05 <br />Enc. <br />cc. Mr. Gary Myers <br />Mr. Jim Griffen <br />L?onaro Rice ConsutVng Water Engineers.Inc <br />