Laserfiche WebLink
19. The estimated costs for revegetation include an anticipated failure rate of 20%. The <br />Division believes that a failure rate of 50% is more appropriate, given the topography, <br />climate, and our observations of reclamation in the vic~mty of the none. <br />I have enclosed a copy of the Division's estimate, along with a table which illustrates a <br />imated costs and those of the Division. If you have questions or need <br />please contact me. <br />Protection Specialist <br />stn~oczrvb.we <br />David A Berry <br /> <br />Enclosure <br />