Laserfiche WebLink
~: <br /> <br /> <br />PRELIT~IINARY ADEQUACY REVIE4] <br />FOR HUNGER CANYON <br />APRIL 21, 1961 <br />2.03.6 <br />R.CEIVED <br />JUL b 151 <br />'M1INED LAND RECLAI.IATION-COAL <br />COLO. DE?T. OF NATURAL REi .'.3CE5 <br />Exhibit C-VII in Appendix C of the application erroneously <br />2.03.10 <br />d <br />Documentation indicating possession of an NPDES permit <br />I <br />I <br />~' <br />described the requested right-of-way in T. B S.; however, a <br />map was also provided to the BLM that accurately pinpointed <br />the requested right-of-way in T. 7 S. The matter has been <br />resolved with the BLt•1 and the error noted. Aside from this <br />explanation, no further action will.be taken by SEI in this <br />regard. <br />is not a requirement of the cited section of Colorado Regula- <br />tions. The requirement is that a listing be provided of permits <br />needed. The text (Chapter 2.0) clearly sholas that SEI is aware <br />of the necessity to permit any discharge from a point source <br />that the company is compelled to create to comply with design <br />regulations. As stated in the text, NPDES permits will be obtained <br />prior to commencement of construction. The necessity for NPDES <br />permits has now been identified in Appendix E, as well as the <br />status of these permits. <br />The Garfield County Special Use Permit/Status and the Mesa <br />County Conditional Use Permit have been identified in F.ppendix E. <br />