Laserfiche WebLink
r <br />West and HG Loadout permits. <br />this. <br /> <br />DMG sees no problem with <br />8. Peabody would like to move Seneca coal through Loadout. <br />9. Peabody to add sections of haul road to the permit: 1) <br />paralleling Seneca's TAHR, 2) going to and from the <br />tipple area and 3) going to the coal surge stockpile. <br />There will also be map changes. Will this slow down the <br />review process? DMG said that we would review haul road <br />now, concurrent with permit application review; no delays <br />will be necessary. <br />10. There is an additional acre to be added to the permit <br />area. DMG: don't worry about sending in the additional <br />$10.00. <br />11. Peabody notes transfer of deed set for April 30. 1993. <br />special warranty deed and MSHA number to be sent in with <br />PAR responses (there may be AVS problems in the future <br />because MSHA left HG Coal with the same number). <br />12. Peabody will send final maps showing permit boundary <br />changes after we are sure there will be no further <br />changes to those maps. <br />