My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12537
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12537
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:56 PM
Creation date
11/19/2007 2:31:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Application Correspondence
Doc Date
6/20/1983
Doc Name
CONCERNS DISCUSSED IN A MEETING ON 6/15/1983
From
ACZ INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
regrading, the topsoil (and subsoil) will be removed from stockpile <br />and redistributed on the graded surface. Prior to seeding and <br />planting, the seed bed will be prepared by chisel plowing or discing <br />to alleviate any compaction resulting from redistribution activities. <br />The soil conditions following redistribution will be similar to <br />pre-disturbance conditions. Similar depths of topsoil will be <br />replaced. Water holding capacity and porosity of the reclaimed area <br />should be essentially the same as found in pre-disturbance conditions. <br />Preparation of the seed bed and soil material will decrease the bulk <br />density of the material. Topsoil nutrient levels will be determined <br />after the topsoil has been replaced by sampling for nitrogen, <br />phosphorus, potassium, organic matter, and texture. The appropriate <br />soil amendments will be added to the soil as necessary in consultation <br />with the Division. <br />The planned post-disturbance land use of irrigated agriculture will be <br />established. Measures for determining success of reclamation will <br />consist of comparison of the production of the reclaimed site with the <br />production of the adjacent irrigated agricultural land as shown on the <br />Pre-Disturbance and Post-Disturbance Land Use Map (Map 4) found in the <br />earlier Terror Creek Company submittal. During the 1983 growing <br />season, production information for this reference area will be <br />gathered far comparison. Production information will consist of <br />calculation of the tons per acre of hay produced. Terror Creek <br />Company has made arrangements with the current owner of this area to <br />collect this production information. <br />The material used as a base for stockpiling and handling of coal on <br />the active pad site will not be hauled from the pad area. During <br />backfilling and grading this pad material will be pushed to the north <br />adjacent to the existing cut slope. The material will then be covered <br />by a minimum of four feet of colluvium. <br />Terror Creek Company has prepared this reclamation plan to ensure <br />reclamation success of the area. The techniques described above and <br />
The URL can be used to link to this page
Your browser does not support the video tag.