My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12501
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:55 PM
Creation date
11/19/2007 2:31:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992079
IBM Index Class Name
Application Correspondence
Doc Date
12/24/1992
Doc Name
COMPLETENESS COAL GULCH APPLICATION C-92-079
From
PENNSYLVANIA WEST COAL CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ 1 ~ • IIIIIIIII!IIIIIIIII <br />PENNSYLVANIA WEST COAL COMPANY <br />777 Main Avenue, Ste. 211 <br />Durango, CO 81301 <br />December 22, 1992 RED -.~ , <br />` ~ ~;~~ , <br />,,` <br />M~ o EC2 ~ Igg2 <br />Rq~V , G.a ,';.. <br />Mr. Harry Ranney ~ °> <br />'`~,:. . <br />Division of Minerals and Geology ,f, <br />DEPARTMENT OF NATURAL RESOURCES <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: COMPLETENESS. COAL GULCH APPLICATION C-92-079 <br />Dear Harry: <br />This letter is to confirm our concurrence of the discussion you had with Greg Lewicke and his <br />letter of December 14, 1992, in answer to the discussion and your letter of November 18; <br />1992. <br />We therefore commit to the following: <br />A. Drill three holes. (See Diagram Enclosed) <br />1. Hole 92-1A will be drilled into the Cliffhouse Sandstone. A 4 1/2" OD PVC <br />glued jointed pipe will be installed for pump tests and on-going testing of water <br />in the formation. <br />2. Hole 92-16 will be drilled in close proximity to 92-1A, and will be drilled into the <br />bottom of the Menefee Formation. A 4 1/2" OD PVC glued jointed pipe will be <br />installed for pump tests and on-going testing of water in the formation. <br />3. Hole 92-2 will be drilled 80' into the Point Lookout Sandstone. A 4 1/2" OD PVC <br />glued jointed pipe will be installed for pump tests and on-going testing of water <br />in the formation. <br />Holes #92-1 B and 92-2 will be cored for roof seam and floor, geophysically logged for <br />Gamma resistivity and density. <br />
The URL can be used to link to this page
Your browser does not support the video tag.