Laserfiche WebLink
..: <br />-11- <br />XX. Bonding Rule 2.05.7(2)(b) and Rule 3 <br />The applicant estimates that reclamation of the site will cost 57,000. The <br />Division extimates that the minimum allowable bond under the Act of ten <br />thousand (E10,000) dollars is adequate. Given this, the following stipulation <br />is required: <br />Stipulation No. 4 <br />AN ACCEPTABLE PERFORMANCE BOND IN THE AMOUNT OF TEN THOUSAND (E10,000) DOLLARS <br />PAYABLE TO THE STATE OF COLORADO MUST BE FILED WITH THE DIVISION WITHIN FIVE <br />DAYS OF PERMIT APPROVAL. <br />XVI. Operations on Lands Subject to Limitations or Prohibitions - <br />u es an <br />The permit area is not within an area that would be subject to any <br />prohibitions or limitations. <br />The proposed operation is in compliance with the requirements of this section. <br />XXII. Compatibility with Anticipated Adjacent Operations - Rule 2.07.6(2)(1) <br />Reclamation of the Mt. Harris is not considered by the Division to be <br />incompatible with any anticipated adjacent operations. <br />The operation is in compliance with the requirements of this section. <br />XXIII. Demonstration that Surface Coal Mini no and Reclamation Operations can <br />The Division finds that with acceptance of the stipulations within this <br />document and adherence to the reclamation plan outlined in the application <br />that the site can be reclaimed to an industrial post-mining landuse. <br />srs <br />0701E <br />