My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12376
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:32:43 PM
Creation date
11/19/2007 2:29:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Application Correspondence
Doc Name
LEGAL FINANCIAL & COMPLIANCE INFORMATION RULE 2.03
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />3. The underground mine workings would intercept ground <br />water currently flowing toward Twentymile Park, and discharging <br />to the Fish Creek stream/alluvial aquifer system. The <br />applicant should provide an analysis showing the extent to <br />which flow would be decreased in the Fish Creek system. This <br />could be approached by first assessing the quantity and <br />relative significance of the flow passing through the <br />potentially affected area, and then predicting the effect of <br />intercepting this water and discharging it to the Foidel Creek <br />drainage. Water quality impacts should be taken into <br />consideration. Possible effects to the downstream users of <br />surface flow and alluvial ground water should be considered, <br />and mitigations proposed if appropriate. Modeling techniques <br />would be appropriate to facilitate this analysis. <br />4. The reestablishment of natural ground water movement, <br />poatmining, would cause a plume of degraded ground water to <br />migrate towards Twentymile Park and discharge to the Fish Creek <br />steam/alluvial aquifer system. As a result, water quality in ,_ <br />the Fiah Creek system could be altered. The permit application <br />contains a qualitative discussion conerning the migration of <br />this plume, but the assessment needs to be quantified to verify <br />the appicant's conclusions. If the quantitative assessment <br />indicates that water quality in the Fish Creek system would be <br />affected, possible effects to downstream users should be <br />evaluated, and appropriate mitigations proposed. <br />5. The applicant has included a description of the runoff <br />and sediment control system that would be used to meet the <br />normal effluent limitations (T55, Iron, Manganese, pH). <br />However, the Coloado Department of Health has established <br />additional numerical standards for 27 water quality <br />constituents (Attachment B) for all tributaries in the Troui <br />Creek drainage. Since Foidel Creek is an intermittent stream, <br />the effluent itself should meet these standards. The applicant <br />should demonstrate that effluent from the mine site would meet <br />the specific numerical limitations or provide a plan for <br />treatment of the effluent for those standards which are <br />exceeded. (The Division is particularly concerned with the <br />discharge of water from the mine workings and from the spoils <br />dewatetinq well in Section 27.) <br />Surface and Ground Water Monitotinc <br />As requited by Rule 2.05.6(3)(b), the applicant has submitted <br />surface and ground water monitoring plena (Exhibit 10). A <br />preliminary review of this plan has identified several concerns. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.